The solution before revision #20010 of , by Valter. This is not the current version.

Statement

2.3.13. [Insert the problem statement]

For problem $2.3.13$

Solution

Statement

A load of mass is slowly pulled up to a height along an inclined plane using a block and a cable. The work done during this process is . Then the cable is released, and the load slides down. What velocity will it gain by the time it reaches the starting point?

For problem $2.3.13$
For problem

Solution

The difference between the work of the pulling force and the work of friction is equal to the change in potential energy:

During the slide down from the top, friction performs the same amount of work. Let us write the law of conservation of energy:

Substitute the work of friction to express the kinetic energy:

From this, we find the velocity the load will gain upon reaching the starting point:

Answer

Answer

[Insert a concise answer or boxed result]